Guard Rails
 
Before......
     
Guard rail prep work
Guard rail prep work
Rossinante, a home built 55 ft cement yacht was leaking through the wooden guardrails on the aft deck because the bottom rail was rotten.This was removed, the deck sealed & then replaced completely & the guardrails re-attached & stained.
 
After!
 
 
 
     
 
Teak Decks
           
 
 
Kwai Muli - an Oyster, In order to lengthen the life of the existing teak deck we re-caulked where necessary replaced approximately 600 teak plugs & 9 metres of teak planking.
 
         
                 
 
   
                   
                   
 
 
l
 

Cockpit table fabricated in teak faced ply with teak trims for a 35ft charter yacht.

 
     
Cracked Toe - Rail
After !
Before......
46ft New Zealand built hard wood yacht had been involved in a collision, which had cracked the toerail. The section was removed, bolted & epoxied back in place